PM Check List
1 Page
Preview
Page 1
Every six (6) months Perform the following steps every 6 months. For details, refer to the sections listed. • Sections marked URM are found in the User’s Reference manuals for the Aisys anesthesia system. • Sections marked TRM are found in this Technical Reference manual. Checks and Tests: 1. AGSS Maintenance (URM - Part 2, Section 2): • Empty any condensate from the reservoir (disposable item). • Inspect air brake for occlusion on active AGSS. • Inspect, clean or replace filter on active AGSS. • 2.
Breathing System Maintenance (URM - Part 2, Section 2) • Disassemble the breathing system modules and inspect components. Replace any parts that are physically damaged or worn.
3.
Bellows Assembly Maintenance (URM - Part 2, Section 2) • Disassemble the bellows assembly and inspect components. Replace any parts that are physically damaged or worn.
4.
Bellows Assembly Tests (URM - Part 2, Section 2)
5. a. b. c. d. e. f. g. h. i. j. k.
Inspect the system (TRM - Section 3.1) System checkout (TRM - Section 3.2) Backlight test (TRM - Section 3.4) Pipeline and Cylinder tests (TRM - Section 3.5) Flush Flow test (TRM - Section 3.6) Alarm tests (TRM - Section 3.7) Alternate O2 flowmeter tests (TRM - Section 3.8) Auxiliary O2 flowmeter tests, if equipped with option (TRM - Section 3.9) Integrated suction regulator tests, if equipped with option (TRM - Section 3.10) Power failure test (TRM - Section 3.11) Electrical safety tests (TRM - Section 3.12)