Set Up Guide
1 Page
Preview
Page 1
Quick Reference Set Up Guide The following flow diagrams and descriptions represent the logical sequence from set-up to start of use. The sequence separately identifies the steps that are to be performed within the sterile field vs the non-sterile field.
Generator task
Handset task
NON-STERILE FIELD
Footswitch task
Accessory task
STERILE FIELD
Position the OSCAR PRO™ Generator on a flat surface Connect the generator to power supply
INSTALLATION OF GENERATOR
Position the Holder for water bag on the generator and attach a water bag Couple Handset & Probe Mount the Handset Handle Open the pump cover and insert the irrigation tube
1 2
Clip the Irrigation kit to handset and the handset cable
Attach the irrigation tube to the fluid bag Plug Handset Cable into relevant channel output
Plug Handset Cable into Handset
Connect Footswitches tube to relevant air socket
Position Irrigation and Ultrasound Footswitches
ASSEMBLY AND CONNECTION OF HANDSET, PROBE AND ACCESSORIES
3 4
FOOTSWITCHES
Generator Power ON Surgical Function Selection
Channel Selection via Handset Probe Scan via Handset Enable Footswitches Operate: Ultrasound activation via Handset or US Footswitch
Irrigation Start | Stop via Water footswitch
www.oscar-ultrasonic.com OS-2006-PL-E0 A 06/20
SYSTEM INITIALIZATION AND USE